Products
« Category overview | Factories complet
Brick production plant 192.000 t / a(Article number: 2176)
Manufacturer: | unbekannt/unknown |
Memo Inquiry |
---|---|---|
Type: | unbekannt-unknown | |
Year of construction: | - | |
Description: | Clay preparation 2 shift, 5 days Shaping presses house 2 shifts, 6 days Tunnel dryer 3 shifts, 7 days Tunnel kiln 3 shifts, 7 days Unloading and packaging 2 shifts, 6 days Output per day: about 550 t fired ware per month: about 16.500 t per year: about 192.000 t Short description: The ultra-modern production plant is fully automatic and computer controlled. The plant was rebuilt several times and modernized. The control of the complete machine is fully automatic, can be produced by both small-and large-sized honeycomb bricks. The machines and the tunnel furnace are already dismantled and stored in the EU. Consumption Energy consumption for drying and firing is max. 480 kcal / kg, and power consumption of about 40 kWh / t. |
|
Quantity: | 1 pc | |
Data in accordance with manufacturer |